Store Handover Checklist: What to Check Before You Accept
Before you sign off a fitted-out store, walk through this checklist so problems are fixed before opening, not after.
The handover is the last moment when fixing a problem is the contractor’s job, not yours. Walk the store with this list before you sign.
Table Of Content
Electrical
Switch every circuit on and off. Check the distribution board is labelled, every socket works, and there is a clear record of loads.
Lighting
Turn on all lighting and look for dead or flickering spots, uneven areas and aiming that misses the product.
CCTV and network
Confirm every camera shows a clear image, recording is running, and the POS and Wi-Fi network is stable.
Fixtures and glass
Shelves should be level and firmly fixed, glass undamaged, and drawers and doors should open smoothly.
Finishes and snag list
Check paint, flooring, ceiling and joints. Write every issue on a snag list with a date, and sign the handover only when the list is closed.
ProSite hands over every project with a walk-through and a written snag list.